* We had the PKI2018 Workshop, Feb 14-15 [https://www.jlab.org/conferences/pki2018/]. All slides are on the web. It gives us a good contribution to the KLF proposal. | * We had the PKI2018 Workshop, Feb 14-15 [https://www.jlab.org/conferences/pki2018/]. All slides are on the web. It gives us a good contribution to the KLF proposal. | ||
− | * | + | * The conceptual design of the Be-target assembly is done. All details are in the current vesion08 of the proposal [https://wiki.jlab.org/klproject/images/e/e2/KLProposal_46_08.pdf]. The engineering design is in order. |
* After March 13th, we will have more news about a status of the design of CPS for Hall C which we plan to use for Hall D. | * After March 13th, we will have more news about a status of the design of CPS for Hall C which we plan to use for Hall D. | ||
+ | |||
+ | * The conceptual design of the monitor flux by the Edinburgh team is in progress. We hope to have news by the next meeting. | ||
+ | |||
+ | * Cesar is still working to develop a code for PWA and start to work with quasi-data. That is important contribution to the proposal. | ||
+ | |||
+ | * Marouen left the country for a renewal a working visa. He will be back in a month or so. Jose Pelaez | ||
+ | has a code which will allow to accept quasi-data for pion-kaon interaction. Again, that is important contribution to the proposal. |
Revision as of 00:12, 21 February 2018
- Attended:
- We had the PKI2018 Workshop, Feb 14-15 [1]. All slides are on the web. It gives us a good contribution to the KLF proposal.
- The conceptual design of the Be-target assembly is done. All details are in the current vesion08 of the proposal [2]. The engineering design is in order.
- After March 13th, we will have more news about a status of the design of CPS for Hall C which we plan to use for Hall D.
- The conceptual design of the monitor flux by the Edinburgh team is in progress. We hope to have news by the next meeting.
- Cesar is still working to develop a code for PWA and start to work with quasi-data. That is important contribution to the proposal.
- Marouen left the country for a renewal a working visa. He will be back in a month or so. Jose Pelaez
has a code which will allow to accept quasi-data for pion-kaon interaction. Again, that is important contribution to the proposal.