Difference between revisions of "KLF beamline meeting - May 29, 2024"
Jump to navigation
Jump to search
(→Agenda) |
(→Agenda) |
||
Line 4: | Line 4: | ||
*; Progress of CPS design (Tim, Pavel) | *; Progress of CPS design (Tim, Pavel) | ||
− | **; [[media: | + | **; [[media:CPS Z Positions.pdf | CPS Beamline layout]] |
*; New design, construction, and installation schedule estimates (Tim) | *; New design, construction, and installation schedule estimates (Tim) |
Revision as of 09:37, 29 May 2024
Agenda
- Announcements
- Progress of CPS design (Tim, Pavel)
- New design, construction, and installation schedule estimates (Tim)
- Space at the lab (Tim, Eugene)
- Need 700 sq ft general indoor storage on or off site
- 200 sq ft in ESB (KFM detector check out)
- Additional 150 sq ft in lead shed
- Assume MRI magnet comes directly to hall when available
- Recommendation #4 from ERR-1 (Moskov)
- Results of the studies
- Statement regarding the studies of KLF compatibility with MOLLER
- Recommendation #5 from ERR-1 (Tim)
- Results of the studies
- Statement regarding thermal cycling of the targets receiving >1 KW power.
- Any other business
Minutes
Present: Mikhail, Igor