Difference between revisions of "KLF beamline meeting - May 29, 2024"
Jump to navigation
Jump to search
(→Agenda) |
(→Agenda) |
||
Line 7: | Line 7: | ||
*; New design, construction, and installation schedule estimates (Tim) | *; New design, construction, and installation schedule estimates (Tim) | ||
− | |||
**; [[media:KLONG_2026instl_No_MRI.pdf | KLONG Installation Schedule 2026 with no MRI Magnet]] | **; [[media:KLONG_2026instl_No_MRI.pdf | KLONG Installation Schedule 2026 with no MRI Magnet]] | ||
− | |||
**; [[media:KLONG_2025instl_MRI.pdf | KLONG Installation Schedule 2025 with MRI Magnet]] | **; [[media:KLONG_2025instl_MRI.pdf | KLONG Installation Schedule 2025 with MRI Magnet]] | ||
Revision as of 09:39, 29 May 2024
Agenda
- Announcements
- Progress of CPS design (Tim, Pavel)
- New design, construction, and installation schedule estimates (Tim)
- Space at the lab (Tim, Eugene)
- Need 700 sq ft general indoor storage on or off site
- 200 sq ft in ESB (KFM detector check out)
- Additional 150 sq ft in lead shed
- Assume MRI magnet comes directly to hall when available
- Recommendation #4 from ERR-1 (Moskov)
- Results of the studies
- Statement regarding the studies of KLF compatibility with MOLLER
- Recommendation #5 from ERR-1 (Tim)
- Results of the studies
- Statement regarding thermal cycling of the targets receiving >1 KW power.
- Any other business
Minutes
Present: Mikhail, Igor