Difference between revisions of "KLF beamline meeting - May 29, 2024"
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
*; Recommendation #4 from ERR-1 (Moskov) | *; Recommendation #4 from ERR-1 (Moskov) | ||
*: Results of the studies | *: Results of the studies | ||
− | *: Statement regarding the studies of KLF compatibility with MOLLER. '''On May 24, Moskov reported that accelerator folks did not have a time to check a situation with Moeller vs KLF in May and will do that in November.''' | + | *: Statement regarding the studies of KLF compatibility with MOLLER. |
+ | *: '''On May 24, Moskov reported that accelerator folks did not have a time to check a situation with Moeller vs KLF in May and will do that in November.''' | ||
*; Recommendation #5 from ERR-1 (Tim) | *; Recommendation #5 from ERR-1 (Tim) |
Revision as of 11:41, 29 May 2024
Agenda
- Announcements
- Progress of CPS design (Tim, Pavel)
- New design, construction, and installation schedule estimates (Tim)
- Space at the lab (Tim, Eugene)
- Need 700 sq ft general indoor storage on or off site
- 200 sq ft in ESB (KFM detector check out)
- Additional 150 sq ft in lead shed
- Assume MRI magnet comes directly to hall when available
- Recommendation #4 from ERR-1 (Moskov)
- Results of the studies
- Statement regarding the studies of KLF compatibility with MOLLER.
- On May 24, Moskov reported that accelerator folks did not have a time to check a situation with Moeller vs KLF in May and will do that in November.
- Recommendation #5 from ERR-1 (Tim)
- Results of the studies
- Statement regarding thermal cycling of the targets receiving >1 KW power.
- Any other business. On the next meeting, Ilya will report the KL rate from Be-target extracted from SRC measurements.
Minutes
Present: Mikhail, Tim, Edy, Pavel, Eugene, Marshall, Hovanes, Eduard, Vitaly, Beni, P.D., Igor