Difference between revisions of "KLF beamline meeting - September 6, 2024"

From kl project
Jump to navigation Jump to search
Line 7: Line 7:
 
*; Beamline simulations in GEANT4 (Richard)
 
*; Beamline simulations in GEANT4 (Richard)
  
*; Updates on CPS simulations (Pavel)
+
*; Updates on FLUKA simulations (Pavel)
  
 
*; Engineering design progress (Tim)
 
*; Engineering design progress (Tim)

Revision as of 10:25, 3 September 2024

Agenda

  • Announcements
  • Preliminary IERR-1 results (Hovanes)
  • Beamline simulations in GEANT4 (Richard)
  • Updates on FLUKA simulations (Pavel)
  • Engineering design progress (Tim)
  • Any other business

Minutes

Present: