Difference between revisions of "KLF beamline meeting - October 17, 2024"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
*; Announcements | *; Announcements | ||
− | *; Beam tests in 2025 and beam bleed-through (Riad, Edy) | + | *; Beam tests in 2025 and beam bleed-through (Riad, Edy) |
+ | # MOLLER related Beam Tests: (Note laser is back to 249.5 MHz, need to switch to low-rep laser (one shift)) | ||
+ | ## Study photocathode effects from KLong beam | ||
+ | ## Deliver Hall D Low-rep Rate and High Bunch Charge Beam to Hall C | ||
+ | # | ||
*; FLUKA simulations (Pavel) | *; FLUKA simulations (Pavel) |
Revision as of 08:28, 17 October 2024
Agenda
- Announcements
- Beam tests in 2025 and beam bleed-through (Riad, Edy)
- MOLLER related Beam Tests: (Note laser is back to 249.5 MHz, need to switch to low-rep laser (one shift))
- Study photocathode effects from KLong beam
- Deliver Hall D Low-rep Rate and High Bunch Charge Beam to Hall C
- FLUKA simulations (Pavel)
- Updates from GEANT4 simulations (Richard)
- Hypernuclei station (Mikhail)
- Engineering update (Tim)
- Any other business
Minutes
Present: