Difference between revisions of "KLF beamline meeting - October 17, 2024"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
*; Beam tests in 2025 and beam bleed-through (Riad, Edy) | *; Beam tests in 2025 and beam bleed-through (Riad, Edy) | ||
− | # MOLLER related Beam Tests: (Note: laser is back to 249.5 MHz, need to switch to low-rep laser ( | + | # MOLLER related Beam Tests: (Note: laser is back to 249.5 MHz, need to switch to low-rep laser (need one shift)) |
## Study photocathode effects from KLong beam | ## Study photocathode effects from KLong beam | ||
## Deliver Hall D Low-rep Rate and High Bunch Charge Beam to Hall | ## Deliver Hall D Low-rep Rate and High Bunch Charge Beam to Hall |
Revision as of 08:30, 17 October 2024
Agenda
- Announcements
- Beam tests in 2025 and beam bleed-through (Riad, Edy)
- MOLLER related Beam Tests: (Note: laser is back to 249.5 MHz, need to switch to low-rep laser (need one shift))
- Study photocathode effects from KLong beam
- Deliver Hall D Low-rep Rate and High Bunch Charge Beam to Hall
- Hall D Bleed-through:
- FLUKA simulations (Pavel)
- Updates from GEANT4 simulations (Richard)
- Hypernuclei station (Mikhail)
- Engineering update (Tim)
- Any other business
Minutes
Present: