Difference between revisions of "February 28th, 2022"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
− | * On February 16th ''Gabi'' gave a CPS | + | * On February 16th ''Gabi'' gave a talk for a status of the CPS for Hall C [https://userweb.jlab.org/~gabriel/gn_cps_jlab_02_18_2022.pdf] |
* On February 17th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [] | * On February 17th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [] |
Revision as of 14:41, 16 February 2022
Attended: and Igor.
- On February 16th Gabi gave a talk for a status of the CPS for Hall C [1]
- On February 17th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting []