Difference between revisions of "February 28th, 2022"

From kl project
Jump to navigation Jump to search
Line 4: Line 4:
 
* On February 16th ''Gabi'' gave a talk for a status of the CPS for Hall C [https://userweb.jlab.org/~gabriel/gn_cps_jlab_02_18_2022.pdf]
 
* On February 16th ''Gabi'' gave a talk for a status of the CPS for Hall C [https://userweb.jlab.org/~gabriel/gn_cps_jlab_02_18_2022.pdf]
  
* On February 17th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting []
+
* On February 17th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/February_17,_2022_KLONG_Phase_II_Design_Meeting#Requirements_and_things_to_finalize]

Revision as of 17:43, 16 February 2022

Attended: and Igor.


  • On February 16th Gabi gave a talk for a status of the CPS for Hall C [1]
  • On February 17th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [2]