* On February 17th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/February_17,_2022_KLONG_Phase_II_Design_Meeting#Requirements_and_things_to_finalize]
 
* On February 17th, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/February_17,_2022_KLONG_Phase_II_Design_Meeting#Requirements_and_things_to_finalize]
 +
 +
* There are several coming meetings: [https://indico.jlab.org/event/498/ CPHI2022, March 7-12], [], [], []

Revision as of 12:45, 24 February 2022

Attended: and Igor.


  • On February 16th Gabi gave a talk for a status of the CPS for Hall C [1]
  • On February 17th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [2]