* On March 3rd, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting] | * On March 3rd, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting] | ||
+ | |||
+ | * In particular, Vitaly performed simulations for CPS using FLUKA |
Revision as of 13:57, 3 March 2022
Attended: and Igor.
- On March 3rd, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
- In particular, Vitaly performed simulations for CPS using FLUKA