Difference between revisions of "March 28th, 2022"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
* On March 3rd, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting] | * On March 3rd, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting] | ||
− | * In particular, Vitaly performed simulations for CPS using FLUKA | + | * In particular, Vitaly performed simulations for CPS using FLUKA [] |
Revision as of 13:58, 3 March 2022
Attended: and Igor.
- On March 3rd, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
- In particular, Vitaly performed simulations for CPS using FLUKA []