Difference between revisions of "March 28th, 2022"

From kl project
Jump to navigation Jump to search
Line 4: Line 4:
 
* On March 3rd, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting]
 
* On March 3rd, we had a ''Tim's'' meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [https://halldweb.jlab.org/wiki/index.php/March_03,_2022_KLONG_Phase_II_Design_Meeting]
  
* In particular, Vitaly performed simulations for CPS using FLUKA [https://wiki.jlab.org/klproject/images/f/fe/BaturinMarch22.pptx]
+
* In particular, ''Vitaly'' performed simulations for CPS using FLUKA and reported on ''Tim's'' meeting [https://wiki.jlab.org/klproject/images/f/fe/BaturinMarch22.pptx]
 +
 
 +
 
 +
* On March 11th, we had a ''Hovanes'' meeting for a development of the engineering design of the Tiger hall with CPS []

Revision as of 08:51, 11 March 2022

Attended: and Igor.


  • On March 3rd, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
  • In particular, Vitaly performed simulations for CPS using FLUKA and reported on Tim's meeting [2]


  • On March 11th, we had a Hovanes meeting for a development of the engineering design of the Tiger hall with CPS []