Difference between revisions of "March 28th, 2022"

From kl project
Jump to navigation Jump to search
Line 8: Line 8:
 
* On March 11th, we had a ''Hovanes''' meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_March_11,_2022]
 
* On March 11th, we had a ''Hovanes''' meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_March_11,_2022]
  
* On January 21st, ''Moskov'' had a ''128-ns'' meeting with injector folks (''Reza Kazimi'', ''Alicia Hofler'', ''Geoffrey Krafft'', ''Shukui Zhang'',  ''Max Bruker'', and ''Joe Grames''). ''Sunil's'' slides are here [https://wiki.jlab.org/klproject/images/3/37/Presentation5.pdf]. It looks that we are getting close to converge. Injector people are thinking to make a test at the end of run.
+
* On March 18th, ''Moskov'' had a ''128-ns'' meeting with injector folks. ''Sunil's'' slides are here [https://wiki.jlab.org/klproject/images/7/7b/Presentation6.pdf]. It looks promising.

Revision as of 14:37, 18 March 2022

Attended: and Igor.


  • On March 3rd, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
  • In particular, Vitaly performed simulations for CPS using FLUKA and reported on Tim's meeting [2]
  • On March 11th, we had a Hovanes' meeting for a development of the engineering design of the Tiger hall with CPS [3]
  • On March 18th, Moskov had a 128-ns meeting with injector folks. Sunil's slides are here [4]. It looks promising.