Difference between revisions of "March 28th, 2022"

From kl project
Jump to navigation Jump to search
Line 10: Line 10:
 
* On March 18th, ''Moskov'' had a ''128-ns'' meeting with injector folks. ''Sunil's'' slides are here [https://wiki.jlab.org/klproject/images/7/7b/Presentation6.pdf]. It looks promising.
 
* On March 18th, ''Moskov'' had a ''128-ns'' meeting with injector folks. ''Sunil's'' slides are here [https://wiki.jlab.org/klproject/images/7/7b/Presentation6.pdf]. It looks promising.
  
* On March 25th, ''Tanja'' had a ''CPS'' meeting (main focus is CPS for Hall C). ''Vitaly'' gave a talk []
+
* On March 25th, ''Tanja'' had a ''CPS'' meeting (main focus is CPS for Hall C). ''Vitaly'' gave a talk [https://wiki.jlab.org/cuawiki/index.php/Meeting_25_March_2022]
  
 
* On March 25th, we had a ''Hovanes''' meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_March_25,_2022]
 
* On March 25th, we had a ''Hovanes''' meeting for a development of the engineering design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_March_25,_2022]

Revision as of 06:56, 25 March 2022

Attended: and Igor.


  • On March 3rd, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
  • In particular, Vitaly performed simulations for CPS using FLUKA and reported on Tim's meeting [2]
  • On March 11th, we had a Hovanes' meeting for a development of the engineering design of the Tiger hall with CPS [3]
  • On March 18th, Moskov had a 128-ns meeting with injector folks. Sunil's slides are here [4]. It looks promising.
  • On March 25th, Tanja had a CPS meeting (main focus is CPS for Hall C). Vitaly gave a talk [5]
  • On March 25th, we had a Hovanes' meeting for a development of the engineering design of the Tiger hall with CPS [6]