Difference between revisions of "November 15th, 2022"

From kl project
Jump to navigation Jump to search
(Created page with " * On September 12th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_m...")
 
Line 1: Line 1:
 +
<b>Attended</b>: ..., and ''Igor''.
  
  
 
+
* On October 3rd, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_October_3,_2022]. [[ | Temperature map calculations]] (''Tim''). [[ | Updates on the conceptual design]] (''Vitaly'').
* On September 12th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_September_12,_2022]. [[media:CPS_temp_calcs_09_12_22.pdf | Temperature map calculations]] (''Tim''). [[media:CSP_update_09_12_22.pdf | Updates on the conceptual design]] (''Vitaly'').
 

Revision as of 14:01, 2 October 2022

Attended: ..., and Igor.


  • On October 3rd, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [1]. [[ | Temperature map calculations]] (Tim). [[ | Updates on the conceptual design]] (Vitaly).