Difference between revisions of "June 28th, 2023"

From kl project
Jump to navigation Jump to search
Line 10: Line 10:
  
  
* This KPT document is ready for ERR-I [https://wiki.jlab.org/klproject/images/f/f8/Conceptual_Design_of_Beryllium_Target_for_the_KLF_Project_%2823%29.pdf Conceptual design of KPT]
+
* KPT document is ready for ERR-I [https://wiki.jlab.org/klproject/images/f/f8/Conceptual_Design_of_Beryllium_Target_for_the_KLF_Project_%2823%29.pdf Conceptual design of KPT].
 +
 
 +
* KFM document is in progress.
  
  

Revision as of 14:53, 20 June 2023

Attended: Moskov, ..., and Igor.

  • Agenda:
  • 7th KLF Collab meeting is scheduled for September 19 [1].
  • Our preparation for EER-I scheduled for the first week of August (Eugene).
  • CPS status (Hovanes)
  • KFM status (Mikhail)
  • 128-ns status (Moskov)
  • Engeneering work status (Eugene)


  • KFM document is in progress.


  • There are several refs for radiation demage on electronics [2][3][4][5]


  • On June 20th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [6].
  • Thermal analysis and thermal stress analysis in ANSYS (Tim)
  • Summary of thermal analysis of the models (Hovanes)
  • Photon beam and material budget (Pavel)
  • Radiation environment, material budget and photon beam quality (Vitaly)


  • Hovanes informed us that Patrizia is scheduled ERR-I for August 2nd. Committee is coming.