Difference between revisions of "KLF Phase I ERR"

From kl project
Jump to navigation Jump to search
Line 26: Line 26:
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==
:* <font color=blue>''Patrizia Rossi''</font> [Welcome and Introduction], <font color=magenta>xx+yy'</font>.
+
:* <font color=blue>''Patrizia Rossi''</font> [Welcome and Introduction], <font color=magenta>10+5'</font>.
 
:* <font color=blue>''Moskov Amaryan''</font> [KLF: Overview], and #9, <font color=magenta>20+15'</font>.
 
:* <font color=blue>''Moskov Amaryan''</font> [KLF: Overview], and #9, <font color=magenta>20+15'</font>.
 
:* <font color=blue>''Eugene Chudakov''</font> [Hall D Status and the Scope of Work]: #1,12,13, <font color=magenta>xx+yy'</font>.
 
:* <font color=blue>''Eugene Chudakov''</font> [Hall D Status and the Scope of Work]: #1,12,13, <font color=magenta>xx+yy'</font>.

Revision as of 07:16, 30 June 2023

KLF Phase I ERR (August 2nd, 2023)

KLF Proposal

Charge

Committee

  • Chad Bailey (Environment, Safety, & Health)
  • Dan Carman (Kaon Flux Detector)
  • Silviu Covrig Dusa (Be-Target)
  • Jim Fast (Engineering + Costing) - Chair
  • Joe Grames (Accelerator/KLF beam)
  • Todd Satogata (Accelerator/KLF beam)
  • Jim Shanks (CPS)
  • Lorenzo Zana (CPS)
  • Ed Folts (Division Safety Officer – Observer)
  • Doug Higinbotham (Observer)

Tentative Agenda

  • Patrizia Rossi [Welcome and Introduction], 10+5'.
  • Moskov Amaryan [KLF: Overview], and #9, 20+15'.
  • Eugene Chudakov [Hall D Status and the Scope of Work]: #1,12,13, xx+yy'.
  • Hovanes Egiyan [CPS: Conceptual design] #2,3,4,10, 30+10'.
  • Igor Strakovsky and Vitaly Baturin KPT: Conceptual design and Radiation factors: #5,6,7,12, 20+15'.
  • Mikhail Bashkanov KFM: KL Flux Monitor #8,12, xx+yy'.
  • Tim Whitlatch [CPS and KPT: Engineering design, Cooling, and Cost estimation:] #2,3,5,6,12,13, xx+yy'.
  • Geoff Krafft [Beam bunch space:] #9,10,11, xx+yy'.
  • Edith Nissen [Electron beam characteristics] #10, xx+yy'.

Documents