:* Tonino will give a short presentation about the work he did in the old configuration and the integration in the new.
 
:* Tonino will give a short presentation about the work he did in the old configuration and the integration in the new.
 
:* We shall discuss:
 
:* We shall discuss:
- options to move upstream the whole CPS
+
:- options to move upstream the whole CPS
- options to deflect 0.5 GeV - 5GeV muons on one side of the beamline:
+
:- options to deflect 0.5 GeV - 5GeV muons on one side of the beamline:
— 1) increasing the permanent magnet  Bdl or
+
:— 1) increasing the permanent magnet  Bdl or
— 2) switching from a pure permanent  to a permanent/powerd magnet
+
:— 2) switching from a pure permanent  to a permanent/powerd magnet
— 3) adding a further magnet downstream
+
:— 3) adding a further magnet downstream
- options to shield the detector set up
+
:- options to shield the detector set up
- weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum
+
:- weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum
- other possible issues  
+
:- other possible issues  
- coordination with KLF Coll and Hall-D team
+
:- coordination with KLF Coll and Hall-D team
  
  

Revision as of 19:38, 24 July 2023

Attended: Moskov, ...Igor.

  • On Aug 2nd, ERR-I is sceduled. All details are in [1].


  • On July 25th, we had a Marco muBDX@KLF/CPS meeting disciss the following...
  • Tonino will give a short presentation about the work he did in the old configuration and the integration in the new.
  • We shall discuss:
- options to move upstream the whole CPS
- options to deflect 0.5 GeV - 5GeV muons on one side of the beamline:
— 1) increasing the permanent magnet Bdl or
— 2) switching from a pure permanent to a permanent/powerd magnet
— 3) adding a further magnet downstream
- options to shield the detector set up
- weight, available clearance, of the two dipoles necessary to determine incoming/scattered muon momentum
- other possible issues
- coordination with KLF Coll and Hall-D team


  • On July 24th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].