Difference between revisions of "KLF beamline meeting - May 29, 2024"
Jump to navigation
Jump to search
(→Agenda) |
|||
Line 5: | Line 5: | ||
*; Progress of CPS design (Tim, Pavel) | *; Progress of CPS design (Tim, Pavel) | ||
− | *; New design, construction, and installation schedule estimates (Tim) | + | *; [[media:KLONG_2026instl_No_MRI.pdf | KLONG Installation Schedule 2026 with no MRI Magnet]] New design, construction, and installation schedule estimates (Tim) |
*; Space at the lab (Tim, Eugene) | *; Space at the lab (Tim, Eugene) |
Revision as of 09:17, 29 May 2024
Agenda
- Announcements
- Progress of CPS design (Tim, Pavel)
- KLONG Installation Schedule 2026 with no MRI Magnet New design, construction, and installation schedule estimates (Tim)
- Space at the lab (Tim, Eugene)
- Recommendation #4 from ERR-1 (Moskov)
- Results of the studies
- Statement regarding the studies of KLF compatibility with MOLLER
- Recommendation #5 from ERR-1 (Tim)
- Results of the studies
- Statement regarding thermal cycling of the targets receiving >1 KW power.
- Any other business
Minutes
Present: Mikhail, Igor