Difference between revisions of "KLF beamline meeting - May 29, 2024"

From kl project
Jump to navigation Jump to search
Line 7: Line 7:
 
**; [[media:CPS | ]]
 
**; [[media:CPS | ]]
 
**; Tim:  
 
**; Tim:  
     *** prototype of absorber - next two months
+
     - prototype of absorber - next two months
 
     - finalization of shielding in terms of installation and deinstallation
 
     - finalization of shielding in terms of installation and deinstallation
 
     - magnet and absorber design is nearly finalized (99% ready)
 
     - magnet and absorber design is nearly finalized (99% ready)
 
     - reduced dose allow to operate with cheap resin
 
     - reduced dose allow to operate with cheap resin
**: Pavel:
+
**; Pavel:
 
     - updated model of CPS. Main motivation to accommodate technical requirements, like all joints outside shielding
 
     - updated model of CPS. Main motivation to accommodate technical requirements, like all joints outside shielding
 
     - new model reduces dose on magnet coils.
 
     - new model reduces dose on magnet coils.
Line 18: Line 18:
 
**; [[media:KLONG_2026instl_No_MRI.pdf | KLONG Installation Schedule 2026 with no MRI Magnet]]
 
**; [[media:KLONG_2026instl_No_MRI.pdf | KLONG Installation Schedule 2026 with no MRI Magnet]]
 
**; [[media:KLONG_2025instl_MRI_v2.pdf | KLONG Installation Schedule 2025 with MRI Magnet]]
 
**; [[media:KLONG_2025instl_MRI_v2.pdf | KLONG Installation Schedule 2025 with MRI Magnet]]
 +
 +
    - 2025 is feasible, but would require additional manpower to parallelize operations
 +
    - 2026 is rather relaxed.
 +
    - budget profile is on the way
 +
    - Answer to a question from Igor: an early pre-installation of CPS is not possible due to conflict in location with existing equipment.
  
 
*; Space at the lab (Tim, Eugene)
 
*; Space at the lab (Tim, Eugene)

Revision as of 12:29, 29 May 2024

Agenda

  • Announcements
   - prototype of absorber - next two months
   - finalization of shielding in terms of installation and deinstallation
   - magnet and absorber design is nearly finalized (99% ready)
   - reduced dose allow to operate with cheap resin
    • Pavel
   - updated model of CPS. Main motivation to accommodate technical requirements, like all joints outside shielding
   - new model reduces dose on magnet coils.
   - 2025 is feasible, but would require additional manpower to parallelize operations
   - 2026 is rather relaxed.
   - budget profile is on the way
   - Answer to a question from Igor: an early pre-installation of CPS is not possible due to conflict in location with existing equipment.
  • Space at the lab (Tim, Eugene)
    • Need 700 sq ft general indoor storage on or off site
      200 sq ft in ESB (KFM detector check out)
      Additional 150 sq ft in lead shed
      Assume MRI magnet comes directly to hall when available
  • Recommendation #4 from ERR-1 (Moskov)
    Results of the studies
    Statement regarding the studies of KLF compatibility with MOLLER.
    On May 24, Moskov reported that accelerator folks did not have a time to check a situation with Moeller vs KLF in May and will do that in November.
  • Recommendation #5 from ERR-1 (Tim)
    Results of the studies
    Statement regarding thermal cycling of the targets receiving >1 KW power.
  • Any other business.
    • On the next meeting, Ilya will report the KL rate from Be-target extracted from SRC measurements.
      Mikhail reported that KFM parts are moving from Juelich to JLab and will be ready for installation.

Minutes

Present: Mikhail, Tim, Edy, Pavel, Eugene, Marshall, Hovanes, Eduard, Vitaly, Beni, P.D., Igor