Difference between revisions of "KLF Beamline"

From kl project
Jump to navigation Jump to search
Line 6: Line 6:
 
=== Meetings in 2024 ===
 
=== Meetings in 2024 ===
  
 +
* [[KLF beamline meeting - November 7, 2024]]
 
* [[KLF beamline meeting - October 31, 2024]]
 
* [[KLF beamline meeting - October 31, 2024]]
 
* [[KLF beamline meeting - October 24, 2024]]
 
* [[KLF beamline meeting - October 24, 2024]]

Revision as of 09:41, 6 November 2024

Beamline Meetings

Bi-weekly remote Zoom meetings (every two weeks) on Fridays at 10:00am

Meetings in 2024

Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1606674688?pwd=b3dnTzJWVEtxZExGRnFoY29PSGkxQT09

Meeting ID: 160 667 4688
Passcode: 709878

Pages for the KLF new beamline components


Drawings

Collimator Cave engineering drawing showing the overview of the beamline and the KPT design

Requirements for KLF beam

Table: KLF electron beam specifications
Beam Paramater @ CPS radiator @ KPT entrance
Beam current 50 nA ≤ IB ≤ 5 μA N/A
Beam spot size σxy = 1.2 mm, (0.8 mm ≤ σx,y ≤ 1.5 mm) σx,y ≤ 1 cm
Beam position stability (@ 1 Hz) σx,y ≤ 0.2 mm σx,y ≤ 2 mm
Beam halo (halo-to-peak) < 10−4 at r ≥ 5σx,y N/A
Beam excursion limits in FSD Δx,y ≥ 1 mm Δx,y ≥ 1 cm
Bleedthrough from wrong bunches Specs undefined N/A