Attended: Sean, Jim, Moskov, Geoff, Johan, and Igor. Justin is working in Hall D, while Mikhail is on vacation.

  • On July 27th, Sunil performed calculations for injector to get 128 ns for a bunch spacing [1].
  • On July 22nd, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [2]
  • On July 8th, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [3]
  • On June 24th, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [4]
  • One June 10th, we had Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly [5]