June 20th, 2022

From kl project
Revision as of 07:46, 17 June 2022 by Igor (talk | contribs)
Jump to navigation Jump to search

Attended: ... and Igor.

  • On May 24-26, GlueX Collaboration had a meeting [1]. Talks by Eugene' and Tim mantioned a development for the KLF.
  • On May 27th, we had 5th KLF Collaboration meeting [2]. We had 30+ people attended our meeting. We have a productive discussion about a status of the project and future direction - what-to-do.
  • Since time of approval of our KLF proposal, GlueX setting got new software and two new elements of basic equipment: DIRC and FCAL-II. Can we consider to select a physics coordinator.
  • On June 17th, we had a Hovanes CPS meeting for a development of the engineering design of the Tiger hall with CPS [3].