April 26th, 2017
Jump to navigation
Jump to search
Tentative Agenda [...]
- The recent draft of the KLF proposal v40 [1].
- There are several items left:
- update LQCD Sec. [Robert Edwards and Michael Doering]
- introduce MC for K-pi and statistics [Marouen].
- update a neutron background subSec [Igor].
- list of the new equipment and of the changes in the existing setup required [Eugene]
- general polishing [everybody].
- Avetik and Giessen group have here experience with Philips dSiPM [2], Ketek SiPM (now), and Orsay SAMPIC type of signal measurements. Also a few MCP-PMTs from Hamamatsu, Photonis, and Budker might be available. All he can test on prototypes.
- Schedule for the PAC45 submission:
- May 1: Draft of the proposal will be posted internally to the GlueX Collaboration for discussion.
- May 15-17: We have to have a short presentation at the GlueX Collaboration meeting.
- May 22: Deadline to submit our KLF proposal to PAC45.