KLF Phase I ERR

From kl project
Revision as of 18:02, 30 June 2023 by Igor (talk | contribs)
Jump to navigation Jump to search

KLF Phase I ERR (August 2nd, 2023)

KLF Proposal

Charge

Committee

  • Chad Bailey (Environment, Safety, & Health)
  • Dan Carman (Kaon Flux Detector)
  • Silviu Covrig Dusa (Be-Target)
  • Jim Fast (Engineering + Costing) - Chair
  • Joe Grames (Accelerator/KLF beam)
  • Todd Satogata (Accelerator/KLF beam)
  • Jim Shanks (CPS)
  • Lorenzo Zana (CPS)
  • Ed Folts (Division Safety Officer – Observer)
  • Doug Higinbotham (Observer)

Tentative Agenda

  • Patrizia Rossi, [Welcome and Introduction], 10+5'.
  • Moskov Amaryan, K-long Facility in Hall D, and #9, 20+15'.
  • Eugene Chudakov, [Hall D Status]: #12,13, 15+5'.
  • Hovanes Egiyan, [Status of the project]: #1,13, 15+5'.
  • Hovanes Egiyan, [CPS: Conceptual design]: #2,3,4,10, 30+15'.
  • Igor Strakovsky and Vitaly Baturin, KPT: Conceptual design and Radiation factors: #5,6,7,12, 20+15'.
  • Mikhail Bashkanov, KL Flux Monitor: #8,12, 20+15'.
  • Tim Whitlatch, [CPS and KPT: Engineering design, Cooling, and Cost estimation]: #2,3,5,6,12,13, 20+15'.
  • Geoff Krafft, [Low repetition rate running and Laser status]: #9,10,11, 20+15'.
  • Riad Suleiman, [Beam diagnostics, locks, and considerations for simultaneous parity quality beam]: #9,10,11, 20+15'.
  • Edith Nissen, [Electron beam characteristics]: #10, 20+15'.

Documents