February 28th, 2022

From kl project
Revision as of 23:48, 24 February 2022 by Igor (talk | contribs)
Jump to navigation Jump to search

Attended: and Igor.


  • On February 16th Gabi gave a talk for a status of the CPS for Hall C [1]
  • On February 17th, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [2]