March 28th, 2022
Jump to navigation
Jump to search
Attended: and Igor.
- On March 3rd, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
- In particular, Vitaly performed simulations for CPS using FLUKA and reported on Tim's meeting [2]
- On March 11th, we had a Hovanes meeting for a development of the engineering design of the Tiger hall with CPS []