March 28th, 2022

From kl project
Revision as of 08:51, 11 March 2022 by Igor (talk | contribs)
Jump to navigation Jump to search

Attended: and Igor.


  • On March 3rd, we had a Tim's meeting for a development of the engineering design of the collimator alcove with the Be-target assembly and Flux Monitor setting [1]
  • In particular, Vitaly performed simulations for CPS using FLUKA and reported on Tim's meeting [2]


  • On March 11th, we had a Hovanes meeting for a development of the engineering design of the Tiger hall with CPS []