June 20th, 2022

From kl project
Revision as of 20:31, 26 June 2022 by Igor (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Attended: Moskov, Jim, Sean, and Igor. Mikhail is on shifts, Justin has family busines.

  • On May 24-26, GlueX Collaboration had a meeting [1]. Talks by Eugene and Tim mantioned a development for the KLF.
  • On May 27th, we had 5th KLF Collaboration meeting [2]. 30+ people attended our meeting. We have a productive discussion about a status of the project and future direction - what-to-do.
  • Since time of approval of our KLF proposal, GlueX setting got new software and two new elements of basic equipment: DIRC and FCAL-II. Can we consider to select a physics coordinator?
  • On June 17th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [3].
  • We started to draft a document for the conceptual design of CPS for Hall D.