September 20th, 2022
Jump to navigation
Jump to search
Attended: ..., and Igor.
- On September 12th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [1]. Temperature map calculations (Tim)[2]. Updates on the conceptual design (Vitaly) [].
- On September 19th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [3].
- Thursday, November 3rd, we will have the 6th KLF Collaboration meeting. The tentative agenda is in [4].