KLF Phase I ERR
KLF Phase I ERR (August 2nd, 2023)
KLF Proposal
- KLF Proposal C12-19-001 e-Print: 2008.08215 [nucl-ex]
Charge
Committee
- Chad Bailey (Environment, Safety, & Health)
- Dan Carman (Kaon Flux Detector)
- Silviu Covrig Dusa (Be-Target)
- Jim Fast (Engineering + Costing) - Chair
- Joe Grames (Accelerator/KLF beam)
- Todd Satogata (Accelerator/KLF beam)
- Jim Shanks (CPS)
- Lorenzo Zana (CPS)
- Ed Folts (Division Safety Officer – Observer)
- Doug Higinbotham (Observer)
Tentative Agenda
- Moskov Amaryan [KLF: Overview], and #9.
- Eugene Chudakov [KLF: Readeness, Cost estimation]: #1,12,13.
- Hovanes Egiyan [CPS: Conceptual design] #2,3,4,10.
- Igor Strakovsky and Vitaly Baturin KPT: Conceptual design and Radiation factors: #5,6,7,12.
- Mikhail Bashkanov KFM: Status Report: #8,12.
- Timothy Whitlatch [CPS and KPT: Engineering design, Cooling, and Cost estimation:] #2,3,5,6,12,13.
- Geoffrey Krafft [Beam bunch space:] #9,10,11.
- Edith Nissen [Electron beam characteristics] #10.
Documents
- [Compact Photon Source for Hall D at Jefferson Laboratory (Technical Note) ]
- Kaon Production Target for Hall D at Jefferson Laboratory (Technical Note)
- [Kaon Flux Monitor for Hall D at Jefferson Laboratory (Technical Note)]