KLF beamline meeting - May 29, 2024

From kl project
Jump to navigation Jump to search

Agenda

  • Announcements
  • Space at the lab (Tim, Eugene)
    • Need 700 sq ft general indoor storage on or off site
      200 sq ft in ESB (KFM detector check out)
      Additional 150 sq ft in lead shed
      Assume MRI magnet comes directly to hall when available
  • Recommendation #4 from ERR-1 (Moskov)
    Results of the studies
    Statement regarding the studies of KLF compatibility with MOLLER.
    On May 24, Moskov reported that accelerator folks did not have a time to check a situation with Moeller vs KLF in May and will do that in November.
  • Recommendation #5 from ERR-1 (Tim)
    Results of the studies
    Statement regarding thermal cycling of the targets receiving >1 KW power.
  • Any other business.
    • On the next meeting, Ilya will report the KL rate from Be-target extracted from SRC measurements.
      Mikhail reported that KFM parts are moving from Juelich to JLab and will be ready for installation.

Minutes

Present: Mikhail, Tim, Edy, Pavel, Eugene, Marshall, Hovanes, Eduard, Vitaly, Beni, P.D., Igor