KLF beamline meeting - October 17, 2024
Jump to navigation
Jump to search
Agenda
- Announcements
- Beam tests in 2025 and beam bleed-through (Riad, Edy)
- MOLLER related Beam Tests: (Note: laser is back to 249.5 MHz, need to switch to low-rep laser (takes one shift))
- Study photocathode effects from KLong beam
- Deliver Hall D Low-rep Rate and High Bunch Charge Beam to Hall
- Hall D Bleed-through:
- FLUKA simulations (Pavel)
- Updates from GEANT4 simulations (Richard)
- Hypernuclei station (Mikhail)
- Engineering update (Tim)
- Any other business
Minutes
Present: