KLF beamline meeting - October 17, 2024

From kl project
Revision as of 07:34, 17 October 2024 by Suleiman (talk | contribs)
Jump to navigation Jump to search

Agenda

  • Announcements
  • Beam tests in 2025 and beam bleed-through (Riad, Edy)
  1. MOLLER related Beam Tests: (Note: laser is back to 249.5 MHz, need to switch to low-rep laser (need one shift))
    1. Study photocathode effects from KLong beam
    2. Deliver Hall D Low-rep Rate and High Bunch Charge Beam to Hall
  2. Hall D Bleed-through:
    1. Bleed-through that originates at injector because each drive laser produces some DC beam that bleeds across all three chopper slits
    2. RF bleed-through experienced by Hall A last weekend.  It results from bad RF phasing. 
  • FLUKA simulations (Pavel)
  • Updates from GEANT4 simulations (Richard)
  • Engineering update (Tim)
  • Any other business

Minutes

Present: