KLF beamline meeting - October 17, 2024
Jump to navigation
Jump to search
Agenda
- Announcements
- Beam tests in 2025 and beam bleed-through (Riad, Edy)
- MOLLER related Beam Tests: (Note: laser is back to 249.5 MHz, need to switch to low-rep laser (need one shift))
- Study photocathode effects from KLong beam
- Deliver Hall D Low-rep Rate and High Bunch Charge Beam to Hall
- Hall D Bleed-through:
- RF bleed-through results from bad RF Separator phasing. This can be eliminated.
- Bleed-through that originates at injector because each drive laser produces some dc beam that bleeds across all three chopper slits. All empty RF buckets will be filled with bleed-through current. Other halls worried about effect on polarization, otherwise no issues. KLong should worry about accidentals and timing. Accelerator wants a requirement document. Bleed-through can be measured in injector. We will need to submit a beam test request. KLong should also receive a timing signal from Injector at 15.6 MHz.
- FLUKA simulations (Pavel)
- Updates from GEANT4 simulations (Richard)
- Hypernuclei station (Mikhail)
- Engineering update (Tim)
- Any other business
Minutes
Present: