X17/PRad II ERR
From Pcrewiki
Revision as of 09:25, 27 March 2025 by Pasyuk (talk | contribs) (→The review will take place May 9, 2025)
UDER CONSTRUCTION...
The review will take place May 8-9, 2025
Review committe
Charge to the review
ERR Report
Agenda (draft)
- 0:0 Executive Session
- 0:0 General overview of experiments (20 min) Ashot
- 0:0 Overview of the experimental setup, required beam parameters (15 minutes) Ashot/Dipangkar
- 0:0 Run plan including commissioning (20 min) Ashot/Dipangkar
- 0:0 HyCal (20 min) Ashot
- 0:0 PRad Target (20 min) - Xiangdong
- 0:0 GEM (20 min) - Nilanga
- 0:0 DAQ, on-line and off-line software, trigger, slow controls (25 min) - Chao
- 0:0 Experiment configuration layout, pre-installation, and installation schedule (20 min) Bob
- 0:0 Radiation dose on the calorimeter (15 min) Weizhi
- 0:0 Run documentation COO, ESAD, RSAD, etc.] (10 min) Eugene
- 0:0 Staffing of the experiment (shifts, Run coordinators) (15 min) Dipangar
- 0:0 Path to first publications (10 min) Haiyan
- 0:0 Executive Session
- 0:0 Closeout
Materials for ERR
Presentations
Documentation
Standard Run documentation
- Conduct of Operations (COO) (Eugene)
- Experiment Safety Assessment Document (ESAD) (Eugene)
- Radiation Safety Assessment Document (RSAD) (Eugene, Weizhi)
- Hall B Emergency Response Guidelines (ERG) (Eugene)
- Pre-run checkout (Rafo, Eugene)
Operational procedures for non-standard equipment
PRad Target
- PRad Target ePAS (Xiangdong)
- PRad Target Operation procedures (Xiangdong)
HyCal
- HyCal ePAS (Eugene)
- HyCal Operation procedures (Ashot,Eugene))
- HyCal Transporter ePAS (Eugene, Krister)
- HyCal Transporter Operation procedures (Eugene, Krister)
GEM
- GEM ePAS (Florian)
- GEM Operation procedures (Nilanga, Florian)
Vacuum Chamber
- Vacuum Chamber ePAS (Bob)