+ | *Commisionning Plans | ||
*[https://wiki.jlab.org/pcrewiki/images/3/33/Operation_PRad_Target.pdf Target Operation procedures] | *[https://wiki.jlab.org/pcrewiki/images/3/33/Operation_PRad_Target.pdf Target Operation procedures] | ||
*[https://wiki.jlab.org/pcrewiki/images/4/4d/HYCAL_transporter_procedures.pdf HyCal Transporter Procedures] | *[https://wiki.jlab.org/pcrewiki/images/4/4d/HYCAL_transporter_procedures.pdf HyCal Transporter Procedures] | ||
Line 36: | Line 35: | ||
</font> | </font> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
= Short Term Schedule = | = Short Term Schedule = |
Revision as of 14:20, 4 April 2016
[edit]
PRad 2016 run, May 1st to June 1st, weekends nights.
to be added.
Beam energy ? to be added.
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
| valign=top |
Shift Schedule
Checklist
Hot Checkout
Beam Time Accounting
Run Spreadsheet 2016
| valign=top |
Procedures
- Commisionning Plans
- Target Operation procedures
- HyCal Transporter Procedures
| valign=top |
Manuals
| valign=top |
JLab Logbooks
RC: Ashot (Bluejeans info for Run Meetings on TBD )
- (999) 123-4567
- 9 123 4567 from Counting Room
PDL: Ashot
Run Plan for February 12 - 15, 2016:Start close-up of the Hall at ?? on ?? , May 1 (see "General instruction" on the right)After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right)Establish beam to the tagger dump (see "General instruction" on the right)Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
CODA Instructions:
HyCal Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |