Difference between revisions of "X17/PRad II ERR"
From Pcrewiki
Jump to navigationJump to search (→Agenda) |
|||
Line 19: | Line 19: | ||
* '''0:0''' Physics goals of the X17/PRad II experiments (xx min) ''speaker'' | * '''0:0''' Physics goals of the X17/PRad II experiments (xx min) ''speaker'' | ||
* '''0:0''' Overview of the experimental setup, required beam parameters (xx minutes) ''speaker'' | * '''0:0''' Overview of the experimental setup, required beam parameters (xx minutes) ''speaker'' | ||
− | * '''0:0''' Run plan including commissioning | + | * '''0:0''' Run plan including commissioning (xx) ''speaker'' |
* '''0:0''' HyCal | * '''0:0''' HyCal | ||
* '''0:0''' PRad Target (xx min) - ''speaker'' | * '''0:0''' PRad Target (xx min) - ''speaker'' | ||
Line 31: | Line 31: | ||
* '''0:0''' Executive Session | * '''0:0''' Executive Session | ||
* '''0:0''' Closeout | * '''0:0''' Closeout | ||
− | |||
==ERR Report== | ==ERR Report== |
Revision as of 18:19, 25 February 2025
Review committe
Charge to the review
The review will take place May 9, 2025
Documents
Agenda
- 0:0 Executive Session
- 0:0 Physics goals of the X17/PRad II experiments (xx min) speaker
- 0:0 Overview of the experimental setup, required beam parameters (xx minutes) speaker
- 0:0 Run plan including commissioning (xx) speaker
- 0:0 HyCal
- 0:0 PRad Target (xx min) - speaker
- 0:0 GEM (xx min) - speaker
- 0:0 DAQ, on-line and off-line software, slow controls (xx min) - speaker
- 0:0 Experiment configuration layout, pre-installation, and installation schedule (xx min) speaker
- 0:0 radiation conditions (xx min) speaker
- 0:0 Run documentation COO, ESAD, RSAD, etc.] (xx min) speaker
- 0:0 Staffing of the experiments (shifts, Run coordinators) (xx min) speaker
- 0:0 Path to first publications
- 0:0 Executive Session
- 0:0 Closeout
ERR Report
Materials for ERR
Presentations
Documentation
- X17 Proposal
- PRad II proposal
Run documentation
- Conduct of Operations (COO)
- Experiment Safety Assessment Document (ESAD)
- Radiation Safety Assessment Document (RSAD)
- Hall B Emergency Response Guidelines (ERG)
- Pre-run checkout
Operational procedures for non-standard equipment
PRad Target
- PRad Target ePAS
- PRad Target Operation procedures
HyCal
- HyCal ePAS
- HyCal Operation procedures
- HyCal Transporter ePAS
- HyCal Transporter Operation procedures
GEM
- GEM ePAS
- GEM Operation procedures
Vacuum Chamber
- Vacuum Chamber ePAS