Difference between revisions of "X17/PRad II ERR"
From Pcrewiki
Jump to navigationJump to search (→Agenda) |
|||
Line 68: | Line 68: | ||
* HyCal Transporter ePAS | * HyCal Transporter ePAS | ||
* HyCal Transporter Operation procedures | * HyCal Transporter Operation procedures | ||
− | |||
− | |||
==== GEM ==== | ==== GEM ==== | ||
Line 75: | Line 73: | ||
* GEM ePAS | * GEM ePAS | ||
* GEM Operation procedures | * GEM Operation procedures | ||
− | |||
====Vacuum Chamber==== | ====Vacuum Chamber==== | ||
− | |||
* Vacuum Chamber ePAS | * Vacuum Chamber ePAS |
Revision as of 18:37, 25 February 2025
Review committe
Charge to the review
The review will take place May 9, 2025
Documents
Agenda
- 0:0 Executive Session
- 0:0 Physics goals of the PRad II experiments (xx min) speaker
- 0:0 Status of X17 simulation and projected reach (xx mon) speaker
- 0:0 Overview of the experimental setup, required beam parameters (xx minutes) speaker
- 0:0 Run plan including commissioning (xx) speaker
- 0:0 HyCal
- 0:0 PRad Target (xx min) - speaker
- 0:0 GEM (xx min) - speaker
- 0:0 DAQ, on-line and off-line software, slow controls (xx min) - speaker
- 0:0 Experiment configuration layout, pre-installation, and installation schedule (xx min) speaker
- 0:0 radiation conditions (xx min) speaker
- 0:0 Run documentation COO, ESAD, RSAD, etc.] (xx min) speaker
- 0:0 Staffing of the experiments (shifts, Run coordinators) (xx min) speaker
- 0:0 Path to first publications
- 0:0 Executive Session
- 0:0 Closeout
ERR Report
Materials for ERR
Presentations
Documentation
- X17 Proposal
- PRad II proposal
Run documentation
- Conduct of Operations (COO)
- Experiment Safety Assessment Document (ESAD)
- Radiation Safety Assessment Document (RSAD)
- Hall B Emergency Response Guidelines (ERG)
- Pre-run checkout
Operational procedures for non-standard equipment
PRad Target
- PRad Target ePAS
- PRad Target Operation procedures
HyCal
- HyCal ePAS
- HyCal Operation procedures
- HyCal Transporter ePAS
- HyCal Transporter Operation procedures
GEM
- GEM ePAS
- GEM Operation procedures
Vacuum Chamber
- Vacuum Chamber ePAS