Line 17: | Line 17: | ||
* '''0:0''' Executive Session | * '''0:0''' Executive Session | ||
− | * '''0:0''' Physics goals of the PRad II experiments (10 min) '' | + | * '''0:0''' Physics goals of the PRad II experiments (10 min) ''Ashot'' |
− | * '''0:0''' Status of X17 simulation and projected reach (20 min) '' | + | * '''0:0''' Status of X17 simulation and projected reach (20 min) ''Rafo/Tyler'' |
− | * '''0:0''' Overview of the experimental setup, required beam parameters (15 minutes) '' | + | * '''0:0''' Overview of the experimental setup, required beam parameters (15 minutes) ''Ashot/Dipangkar'' |
− | * '''0:0''' Run plan including commissioning (20 min) '' | + | * '''0:0''' Run plan including commissioning (20 min) ''Ashot/Dipangkar'' |
− | * '''0:0''' HyCal (20 min) '' | + | * '''0:0''' HyCal (20 min) ''Ashot'' |
− | * '''0:0''' PRad Target (20 min) - '' | + | * '''0:0''' PRad Target (20 min) - ''Xiangdong'' |
− | * '''0:0''' GEM (20 min) - '' | + | * '''0:0''' GEM (20 min) - ''Nilanga'' |
− | * '''0:0''' DAQ, on-line and off-line software, trigger, slow controls (25 min) - '' | + | * '''0:0''' DAQ, on-line and off-line software, trigger, slow controls (25 min) - ''Chao'' |
− | * '''0:0''' Experiment configuration layout, pre-installation, and installation schedule (20 min) '' | + | * '''0:0''' Experiment configuration layout, pre-installation, and installation schedule (20 min) ''Bob'' |
− | * '''0:0''' Radiation dose on the calorimeter (15 min) '' | + | * '''0:0''' Radiation dose on the calorimeter (15 min) ''Weizhi'' |
− | * '''0:0''' Run documentation COO, ESAD, RSAD, etc.] (10 min) '' | + | * '''0:0''' Run documentation COO, ESAD, RSAD, etc.] (10 min) ''Eugene'' |
− | * '''0:0''' Staffing of the | + | * '''0:0''' Staffing of the experiment (shifts, Run coordinators) (15 min) ''Dipangar'' |
− | * '''0:0''' Path to first publications (10 min) | + | * '''0:0''' Path to first publications (10 min) ''Haiyan'' |
* '''0:0''' Executive Session | * '''0:0''' Executive Session | ||
* '''0:0''' Closeout | * '''0:0''' Closeout |
Revision as of 18:49, 25 February 2025
Review committe
Charge to the review
The review will take place May 9, 2025
Documents
Agenda
- 0:0 Executive Session
- 0:0 Physics goals of the PRad II experiments (10 min) Ashot
- 0:0 Status of X17 simulation and projected reach (20 min) Rafo/Tyler
- 0:0 Overview of the experimental setup, required beam parameters (15 minutes) Ashot/Dipangkar
- 0:0 Run plan including commissioning (20 min) Ashot/Dipangkar
- 0:0 HyCal (20 min) Ashot
- 0:0 PRad Target (20 min) - Xiangdong
- 0:0 GEM (20 min) - Nilanga
- 0:0 DAQ, on-line and off-line software, trigger, slow controls (25 min) - Chao
- 0:0 Experiment configuration layout, pre-installation, and installation schedule (20 min) Bob
- 0:0 Radiation dose on the calorimeter (15 min) Weizhi
- 0:0 Run documentation COO, ESAD, RSAD, etc.] (10 min) Eugene
- 0:0 Staffing of the experiment (shifts, Run coordinators) (15 min) Dipangar
- 0:0 Path to first publications (10 min) Haiyan
- 0:0 Executive Session
- 0:0 Closeout
ERR Report
Materials for ERR
Presentations
Documentation
- X17 Proposal
- PRad II proposal
Run documentation
- Conduct of Operations (COO)
- Experiment Safety Assessment Document (ESAD)
- Radiation Safety Assessment Document (RSAD)
- Hall B Emergency Response Guidelines (ERG)
- Pre-run checkout
Operational procedures for non-standard equipment
PRad Target
- PRad Target ePAS
- PRad Target Operation procedures
HyCal
- HyCal ePAS
- HyCal Operation procedures
- HyCal Transporter ePAS
- HyCal Transporter Operation procedures
GEM
- GEM ePAS
- GEM Operation procedures
Vacuum Chamber
- Vacuum Chamber ePAS