Difference between revisions of "X17/PRad II ERR"

From Pcrewiki
Jump to navigationJump to search
Line 2: Line 2:
  
 
==Charge to the review==
 
==Charge to the review==
 +
 +
==ERR Report==
  
  
 
='''The review will take place May 9, 2025'''=
 
='''The review will take place May 9, 2025'''=
  
 
 
 
==Documents==
 
  
  
Line 33: Line 31:
 
* '''0:0'''    Closeout
 
* '''0:0'''    Closeout
  
==ERR Report==
+
 
  
 
=Materials for ERR=
 
=Materials for ERR=

Revision as of 18:57, 25 February 2025

Review committe

Charge to the review

ERR Report

The review will take place May 9, 2025

Agenda

  • 0:0 Executive Session
  • 0:0 Physics goals of the PRad II experiments (10 min) Ashot
  • 0:0 Status of X17 simulation and projected reach (20 min) Rafo/Tyler
  • 0:0 Overview of the experimental setup, required beam parameters (15 minutes) Ashot/Dipangkar
  • 0:0 Run plan including commissioning (20 min) Ashot/Dipangkar
  • 0:0 HyCal (20 min) Ashot
  • 0:0 PRad Target (20 min) - Xiangdong
  • 0:0 GEM (20 min) - Nilanga
  • 0:0 DAQ, on-line and off-line software, trigger, slow controls (25 min) - Chao
  • 0:0 Experiment configuration layout, pre-installation, and installation schedule (20 min) Bob
  • 0:0 Radiation dose on the calorimeter (15 min) Weizhi
  • 0:0 Run documentation COO, ESAD, RSAD, etc.] (10 min) Eugene
  • 0:0 Staffing of the experiment (shifts, Run coordinators) (15 min) Dipangar
  • 0:0 Path to first publications (10 min) Haiyan
  • 0:0 Executive Session
  • 0:0 Closeout


Materials for ERR

Presentations

Documentation

  • X17 Proposal
  • PRad II proposal

Run documentation

  • Conduct of Operations (COO)
  • Experiment Safety Assessment Document (ESAD)
  • Radiation Safety Assessment Document (RSAD)
  • Hall B Emergency Response Guidelines (ERG)
  • Pre-run checkout

Operational procedures for non-standard equipment

PRad Target

  • PRad Target ePAS
  • PRad Target Operation procedures

HyCal

  • HyCal ePAS
  • HyCal Operation procedures
  • HyCal Transporter ePAS
  • HyCal Transporter Operation procedures

GEM

  • GEM ePAS
  • GEM Operation procedures

Vacuum Chamber

  • Vacuum Chamber ePAS