Difference between revisions of "X17/PRad II ERR"
From Pcrewiki
Jump to navigationJump to search (→Agenda) |
|||
Line 57: | Line 57: | ||
====PRad Target==== | ====PRad Target==== | ||
− | * PRad Target ePAS | + | * PRad Target ePAS ''(Xiangdong)'' |
− | * PRad Target Operation procedures | + | * PRad Target Operation procedures ''(Xiangdong)'' |
====HyCal==== | ====HyCal==== | ||
− | * HyCal ePAS | + | * HyCal ePAS ''(Eugene)'' |
− | * HyCal Operation procedures | + | * HyCal Operation procedures ''(Ashot,Eugene)'')'' |
− | * HyCal Transporter ePAS | + | * HyCal Transporter ePAS ''(Eugene,Krister)'' |
− | * HyCal Transporter Operation procedures | + | * HyCal Transporter Operation procedures ''(Eugene,Krister)'' |
==== GEM ==== | ==== GEM ==== | ||
− | * GEM ePAS | + | * GEM ePAS ''(Florian)'' |
− | * GEM Operation procedures | + | * GEM Operation procedures ''(Nilanga,Florian)'' |
====Vacuum Chamber==== | ====Vacuum Chamber==== | ||
− | * Vacuum Chamber ePAS | + | * Vacuum Chamber ePAS ''(Bob)'' |
Revision as of 16:54, 26 February 2025
The review will take place May 9, 2025
Review committe
Charge to the review
ERR Report
Agenda
- 0:0 Executive Session
- 0:0 General overview of experiments (10 min) Ashot
- 0:0 PRad II projected results (20 min) Ashot/Weizhi
- 0:0 X17 projected reach (20 min) Rafo/Tyler
- 0:0 Overview of the experimental setup, required beam parameters (15 minutes) Ashot/Dipangkar
- 0:0 Run plan including commissioning (20 min) Ashot/Dipangkar
- 0:0 HyCal (20 min) Ashot
- 0:0 PRad Target (20 min) - Xiangdong
- 0:0 GEM (20 min) - Nilanga
- 0:0 DAQ, on-line and off-line software, trigger, slow controls (25 min) - Chao
- 0:0 Experiment configuration layout, pre-installation, and installation schedule (20 min) Bob
- 0:0 Radiation dose on the calorimeter (15 min) Weizhi
- 0:0 Run documentation COO, ESAD, RSAD, etc.] (10 min) Eugene
- 0:0 Staffing of the experiment (shifts, Run coordinators) (15 min) Dipangar
- 0:0 Path to first publications (10 min) Haiyan
- 0:0 Executive Session
- 0:0 Closeout
Materials for ERR
Presentations
Documentation
- X17 Proposal
- PRad II proposal
Run documentation
- Conduct of Operations (COO)
- Experiment Safety Assessment Document (ESAD)
- Radiation Safety Assessment Document (RSAD)
- Hall B Emergency Response Guidelines (ERG)
- Pre-run checkout
Operational procedures for non-standard equipment
PRad Target
- PRad Target ePAS (Xiangdong)
- PRad Target Operation procedures (Xiangdong)
HyCal
- HyCal ePAS (Eugene)
- HyCal Operation procedures (Ashot,Eugene))
- HyCal Transporter ePAS (Eugene,Krister)
- HyCal Transporter Operation procedures (Eugene,Krister)
GEM
- GEM ePAS (Florian)
- GEM Operation procedures (Nilanga,Florian)
Vacuum Chamber
- Vacuum Chamber ePAS (Bob)