Line 58: Line 58:
 
* [https://misportal.jlab.org/pacProposals/proposals/1565/attachments/127328/Proposal.pdf PRad II proposal]
 
* [https://misportal.jlab.org/pacProposals/proposals/1565/attachments/127328/Proposal.pdf PRad II proposal]
  
===Run documentation=== ''(Eugene)''
+
===Standard Run documentation===  
  
* Conduct of Operations (COO)
+
 
* Experiment Safety Assessment Document (ESAD)
+
* Conduct of Operations (COO) ''(Eugene)''
* Radiation Safety Assessment Document (RSAD)
+
* Experiment Safety Assessment Document (ESAD) ''(Eugene)''
* Hall B Emergency Response Guidelines (ERG)
+
* Radiation Safety Assessment Document (RSAD) ''(Eugene, Weizhi)''
* Pre-run checkout
+
* Hall B Emergency Response Guidelines (ERG) ''(Eugene)''
 +
* Pre-run checkout ''(Rafo, Eugene)''
  
 
===Operational procedures for non-standard equipment===
 
===Operational procedures for non-standard equipment===

Revision as of 10:39, 28 February 2025

UDER CONSTRUCTION...

The review will take place May 9, 2025

Review committe

Charge to the review

ERR Report

Agenda

  • 0:0 Executive Session
  • 0:0 General overview of experiments (10 min) Ashot
  • 0:0 Overview of the experimental setup, required beam parameters (15 minutes) Ashot/Dipangkar
  • 0:0 Run plan including commissioning (20 min) Ashot/Dipangkar
  • 0:0 HyCal (20 min) Ashot
  • 0:0 PRad Target (20 min) - Xiangdong
  • 0:0 GEM (20 min) - Nilanga
  • 0:0 DAQ, on-line and off-line software, trigger, slow controls (25 min) - Chao
  • 0:0 Experiment configuration layout, pre-installation, and installation schedule (20 min) Bob
  • 0:0 Radiation dose on the calorimeter (15 min) Weizhi
  • 0:0 Run documentation COO, ESAD, RSAD, etc.] (10 min) Eugene
  • 0:0 Staffing of the experiment (shifts, Run coordinators) (15 min) Dipangar
  • 0:0 Path to first publications (10 min) Haiyan
  • 0:0 Executive Session
  • 0:0 Closeout

Materials for ERR

Presentations

Documentation

Standard Run documentation

  • Conduct of Operations (COO) (Eugene)
  • Experiment Safety Assessment Document (ESAD) (Eugene)
  • Radiation Safety Assessment Document (RSAD) (Eugene, Weizhi)
  • Hall B Emergency Response Guidelines (ERG) (Eugene)
  • Pre-run checkout (Rafo, Eugene)

Operational procedures for non-standard equipment

PRad Target

  • PRad Target ePAS (Xiangdong)
  • PRad Target Operation procedures (Xiangdong)

HyCal

  • HyCal ePAS (Eugene)
  • HyCal Operation procedures (Ashot,Eugene))
  • HyCal Transporter ePAS (Eugene,Krister)
  • HyCal Transporter Operation procedures (Eugene,Krister)

GEM

  • GEM ePAS (Florian)
  • GEM Operation procedures (Nilanga,Florian)

Vacuum Chamber

  • Vacuum Chamber ePAS (Bob)