Difference between revisions of "PRad Experiment Shift Information"
From Pcrewiki
Jump to navigationJump to searchLine 24: | Line 24: | ||
===Procedures=== | ===Procedures=== | ||
− | <!--* [[ | + | <!--* [[PRad Startup Plan|Startup Plan]]--> |
* Commissioning Plans: | * Commissioning Plans: | ||
− | **[[Media: | + | **[[Media:PRad_beamline_comm.pdf|Beamline]] |
− | <!--**[[Media: | + | <!--**[[Media:PRad_BeamTrip_Studies.pdf|Beam Trips]]--> |
− | **[[ | + | **[[PRad 2016 Trigger Commissioning|Trigger]] <!--(old: [[Media:HPS_TriggerCommissioning_March2015.pdf|2015]], [[Media:HPS_TriggerCommissioning_July2014.pdf|2014]])--> |
− | **[[Media: | + | **[[Media:PRad_HyCal_Commissioning.pdf|HyCal]] |
− | **[[Media: | + | **[[Media:PRad_SVT_Commissioning.pdf|SVT]] |
− | <!--* [[Media: | + | <!--* [[Media:PRad_BeamTripRecovery.pdf|Beam Trip Recovery]]--> |
* SVT TOSP ([[Media:hps_svt_tosp_1.pdf|1]],[[Media:hps_svt_tosp_2.pdf|2]],[[Media:hps_svt_tosp_3.pdf|3]]) | * SVT TOSP ([[Media:hps_svt_tosp_1.pdf|1]],[[Media:hps_svt_tosp_2.pdf|2]],[[Media:hps_svt_tosp_3.pdf|3]]) | ||
* [[Media:Accessing_the_tunnel.pdf|Tunnel/Hall Access]] | * [[Media:Accessing_the_tunnel.pdf|Tunnel/Hall Access]] |
Revision as of 15:51, 12 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
{Phone Numbers}}Shift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Takashi Maruyama (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 12 - 15, 2016:Start close-up of the Hall at 3pm on Friday, February 12 (see "General instruction" on the right)After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right)Establish beam to the tagger dump (see "General instruction" on the right)Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |