Difference between revisions of "PRad Experiment Shift Information"
From Pcrewiki
Jump to navigationJump to searchLine 19: | Line 19: | ||
<!--* [http://www.jlab.org/~baltzell/HPS/engrun/HPS_Runs_2015.xlsx MSOffice], [http://www.jlab.org/~baltzell/HPS/engrun/HPS_Runs_2015.ods OpenOffice]--> | <!--* [http://www.jlab.org/~baltzell/HPS/engrun/HPS_Runs_2015.xlsx MSOffice], [http://www.jlab.org/~baltzell/HPS/engrun/HPS_Runs_2015.ods OpenOffice]--> | ||
− | <!--* [[Media: | + | <!--* [[Media:PRad_hallb_checklist.pdf|Hall-B Checklist Preparing for Beam]]--> |
| valign=top | | | valign=top | | ||
Line 35: | Line 35: | ||
* [[Media:Accessing_the_tunnel.pdf|Tunnel/Hall Access]] | * [[Media:Accessing_the_tunnel.pdf|Tunnel/Hall Access]] | ||
* [[Media:Power_Failure_Procedures.pdf|Power Failure]] | * [[Media:Power_Failure_Procedures.pdf|Power Failure]] | ||
− | <!--* [[Media: | + | <!--* [[Media:PRad_svt_tosp.docx|SVT TOSP]] ([[Media:PRad_svt_tosp_1.pdf|1]],[[Media:hps_svt_tosp_2.pdf|2]],[[Media:hps_svt_tosp_3.pdf|3]])--> |
− | <!--* [[ | + | <!--* [[PRad Preliminary Run Schedule|Preliminary Run Schedule]]--> |
− | <!--* [[ | + | <!--* [[PRad Run Coordinator Duties|Run Coordinator Duties]]--> |
<!--* [[Command List Reference]]--> | <!--* [[Command List Reference]]--> | ||
Revision as of 15:54, 12 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
{Phone Numbers}}Shift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Takashi Maruyama (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 12 - 15, 2016:Start close-up of the Hall at 3pm on Friday, February 12 (see "General instruction" on the right)After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right)Establish beam to the tagger dump (see "General instruction" on the right)Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |