Difference between revisions of "PRad Experiment Shift Information"
From Pcrewiki
Jump to navigationJump to searchLine 192: | Line 192: | ||
# See the '''whiteboard''' for everything else that should be done on a per-run basis. | # See the '''whiteboard''' for everything else that should be done on a per-run basis. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | === | + | ===CODA Instructions:=== |
+ | # First open a terminal type : ssh pradrun@prad use the username:pradrun , password: pradtocome | ||
+ | # then at home directory ,do: ~/source SourThisForCoda.csh [Enter] | ||
+ | # open a new terminal to start the msqld, do: ~/ msqld [Enter] | ||
+ | # open a new terminal to start the rcplatform, do: ~/rcplatform [Enter] | ||
+ | # open a new terminal to start the coda, do: | ||
+ | #* ~/codamaster [Enetr] choose "pradrun" configuration,then enable botton for et,eb,and er,then hit runcontrol. | ||
+ | #* in CODA Gui, hit connect button then hit configure button, then hit download,then hit prestart, then hit go button, now it should start taking data. | ||
+ | # if you re-start et , please do: ~/ rm /tmp/et_sys_PRad01 before you start the CODA. | ||
+ | |||
+ | |||
+ | |||
+ | ===HyCal Instructions:=== | ||
*HV must be OFF during FIRST delivery of beam to the Faraday Cup after tuning to the Tagger Dump. | *HV must be OFF during FIRST delivery of beam to the Faraday Cup after tuning to the Tagger Dump. | ||
**Only after stable beam established to Faraday Cup can HV can be turned ON. | **Only after stable beam established to Faraday Cup can HV can be turned ON. |
Revision as of 15:34, 4 March 2016
[edit]
PRad 2016 run, May 1st to June 1st, weekends nights.
to be added.
Beam energy ? to be added.
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
{Phone Numbers}}Shift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Ashot (Bluejeans info for Run Meetings on TBD )
- (999) 123-4567
- 9 123 4567 from Counting Room
PDL: Ashot
Run Plan for February 12 - 15, 2016:Start close-up of the Hall at ?? on ?? , May 1 (see "General instruction" on the right)After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right)Establish beam to the tagger dump (see "General instruction" on the right)Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
CODA Instructions:
HyCal Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |