Difference between revisions of "PRad Daily Run Meetings"
From Pcrewiki
Jump to navigationJump to searchLine 4: | Line 4: | ||
===June 13=== | ===June 13=== | ||
*HyCal Calibration | *HyCal Calibration | ||
− | *GEM data analysis | + | *GEM data analysis[https://wiki.jlab.org/pcrewiki/index.php/File:0613.pdf] |
*HyCal gain monitoring and stability, correlating HyCal and GEM events | *HyCal gain monitoring and stability, correlating HyCal and GEM events | ||
*Run plan for the next shifts | *Run plan for the next shifts | ||
− | |||
===June 12=== | ===June 12=== |
Revision as of 17:01, 13 June 2016
PRad daily run meeting is at 4:30 pm EST in Rm 200 of the counting house (upstairs conference room)
Bluejeans connection url: https://bluejeans.com/6017317348
June 13
- HyCal Calibration
- GEM data analysis[1]
- HyCal gain monitoring and stability, correlating HyCal and GEM events
- Run plan for the next shifts
June 12
- HyCal Calibration
- GEM data analysis
- HyCal gain monitoring and stability, correlating HyCal and GEM events
- Run plan for the next shifts
- RC report for Hall-B
June 11
- HyCal Calibration (Ilya): Moller, ep, position
- GEM data analysis (Xinzhan)
- HyCal gain monitoring and stability, correlating Hycal and GEM events (Weizhi)
- Run plan for the next shifts
- Carbon run estimate