Difference between revisions of "X17/PRad II ERR"
From Pcrewiki
Jump to navigationJump to searchLine 31: | Line 31: | ||
* '''0:0''' Executive Session | * '''0:0''' Executive Session | ||
* '''0:0''' General overview of experiments (20 min) ''Ashot'' | * '''0:0''' General overview of experiments (20 min) ''Ashot'' | ||
− | |||
− | |||
* '''0:0''' Overview of the experimental setup, required beam parameters (15 minutes) ''Ashot/Dipangkar'' | * '''0:0''' Overview of the experimental setup, required beam parameters (15 minutes) ''Ashot/Dipangkar'' | ||
* '''0:0''' Run plan including commissioning (20 min) ''Ashot/Dipangkar'' | * '''0:0''' Run plan including commissioning (20 min) ''Ashot/Dipangkar'' |
Revision as of 14:24, 27 March 2025
UDER CONSTRUCTION...
The review will take place May 8-9, 2025
Review committe
Charge to the review
ERR Report
Agenda (draft)
Materials for ERR
Presentations
Documentation
Standard Run documentation
- Conduct of Operations (COO) (Eugene)
- Experiment Safety Assessment Document (ESAD) (Eugene)
- Radiation Safety Assessment Document (RSAD) (Eugene, Weizhi)
- Hall B Emergency Response Guidelines (ERG) (Eugene)
- Pre-run checkout (Rafo, Eugene)
Operational procedures for non-standard equipment
PRad Target
- PRad Target ePAS (Xiangdong)
- PRad Target Operation procedures (Xiangdong)
HyCal
- HyCal ePAS (Eugene)
- HyCal Operation procedures (Ashot,Eugene))
- HyCal Transporter ePAS (Eugene, Krister)
- HyCal Transporter Operation procedures (Eugene, Krister)
GEM
- GEM ePAS (Florian)
- GEM Operation procedures (Nilanga, Florian)
Vacuum Chamber
- Vacuum Chamber ePAS (Bob)