Difference between revisions of "PRad Experiment Shift Information"
From Pcrewiki
Jump to navigationJump to searchLine 90: | Line 90: | ||
<center> <font color=red size=4> <b> Important: Document all your work in the logbook! </b> </font> </center> | <center> <font color=red size=4> <b> Important: Document all your work in the logbook! </b> </font> </center> | ||
− | == RC: Ashot (<font size=3>[https://bluejeans.com/ | + | == RC: Ashot (<font size=3>[https://bluejeans.com/6017317348 Bluejeans info for Run Meetings on TBD ]</font>) == |
* (999) 123-4567 | * (999) 123-4567 | ||
* 9 123 4567 from Counting Room | * 9 123 4567 from Counting Room | ||
Line 101: | Line 101: | ||
== <font color=blue><b> Run Plan for February 12 - 15, 2016: </b></font>== | == <font color=blue><b> Run Plan for February 12 - 15, 2016: </b></font>== | ||
− | <!-- == Beam is off and seep starts at 6:45 am on Monday, | + | <!-- == Beam is off and seep starts at 6:45 am on Monday, May 1st. == --> |
− | == Start close-up of the Hall at | + | == Start close-up of the Hall at ?? on ?? , May 1 (see "General instruction" on the right) == |
== After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right) == | == After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right) == | ||
== Establish beam to the tagger dump (see "General instruction" on the right) == | == Establish beam to the tagger dump (see "General instruction" on the right) == | ||
== Bring beam to FC: == | == Bring beam to FC: == | ||
− | # <b> Note: in order to have reliable readings on two important for | + | # <b> Note: in order to have reliable readings on two important for PRad, beam current should be > ?? nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged. For orbit lock positions on <font color=red> 2H00(X=~0.,Y=~0.). on 2H02(X=0.4,Y=-0.7). The new positions for collimator at this beam position are: 3.94 mm at 6.198, 2.82 mm at 5.03. (?? number for PRad). Due to higher rates on halo counters we will run with 3.94 mm collimator. </font></b>. All studies should be done with beam currents between 25 nA and 30 nA. |
# The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.05 mm, and the tilt angle <15 degrees. <b> Do not west too much time on beam tune, as long as rates on the halo counters are low - Downstream L/R/T/B and HPS-L/R <~few Hz/nA, and HP-SC < few x 10 Hz, the following program still can be done:</b> | # The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.05 mm, and the tilt angle <15 degrees. <b> Do not west too much time on beam tune, as long as rates on the halo counters are low - Downstream L/R/T/B and HPS-L/R <~few Hz/nA, and HP-SC < few x 10 Hz, the following program still can be done:</b> | ||
#* Check rates on ECal - Turn ON Ecal and observe rates in modules close to the beam in Top and Bottom. If rates are too asymmetric (difference is larger than 30%) try to equalize or bring them close by moving the beam vertically from high rate module towards the low rate. Note, movement must be done according to 2H02 Y-position readings. SVT collimator must be positoned accordingly - remember BPM readings are in mm, collimator steps are in inches. | #* Check rates on ECal - Turn ON Ecal and observe rates in modules close to the beam in Top and Bottom. If rates are too asymmetric (difference is larger than 30%) try to equalize or bring them close by moving the beam vertically from high rate module towards the low rate. Note, movement must be done according to 2H02 Y-position readings. SVT collimator must be positoned accordingly - remember BPM readings are in mm, collimator steps are in inches. | ||
− | # Study rates on | + | # Study rates on HyCal channels for (make a log entry of PRad GUI ? for each condition): |
#* as a function of beam current without and with production target (4 um W). | #* as a function of beam current without and with production target (4 um W). | ||
#* for different collimators (3.94 mm, 2.82 mm, and 2.25 mm) without and with target | #* for different collimators (3.94 mm, 2.82 mm, and 2.25 mm) without and with target | ||
− | <!-- #* Check the FSD system (see procedures on the Documentation page). Call | + | <!-- #* Check the FSD system (see procedures on the Documentation page). Call ? Ashot ?. |
--> | --> | ||
# Start trigger rates studies, establish running conditions (see instructions under "Procedures" on the documentation tab for "Trigger"). | # Start trigger rates studies, establish running conditions (see instructions under "Procedures" on the documentation tab for "Trigger"). | ||
− | #* Take parasitic data on fast beam motion using struck scaler system. Call | + | #* Take parasitic data on fast beam motion using struck scaler system. Call ? Ashot ? if it is between 8am and 10pm. |
# If beam stability and profile are acceptable: | # If beam stability and profile are acceptable: | ||
− | #* | + | #* ?? |
− | #* | + | #* ?? |
=== Miscellaneous Notes: === | === Miscellaneous Notes: === | ||
− | # Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents. | + | # ?? Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents. |
Revision as of 16:08, 12 February 2016
[edit]
PRad 2016 run, May 1st to June 1st, weekends nights.
to be added.
Beam energy ? to be added.
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
{Phone Numbers}}Shift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Ashot (Bluejeans info for Run Meetings on TBD )
- (999) 123-4567
- 9 123 4567 from Counting Room
PDL: Ashot
Run Plan for February 12 - 15, 2016:Start close-up of the Hall at ?? on ?? , May 1 (see "General instruction" on the right)After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right)Establish beam to the tagger dump (see "General instruction" on the right)Bring beam to FC:
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |