X17/PRad II ERR
From Pcrewiki
Jump to navigationJump to searchReview committe
Charge to the review
The review will take place May 9, 2025
Documents
Agenda
- 0:0 Executive Session
- 0:0 Physics goals of the PRad II experiments (10 min) speaker
- 0:0 Status of X17 simulation and projected reach (20 min) speaker
- 0:0 Overview of the experimental setup, required beam parameters (15 minutes) speaker
- 0:0 Run plan including commissioning (20 min) speaker
- 0:0 HyCal (20 min) speaker
- 0:0 PRad Target (20 min) - speaker speaker
- 0:0 GEM (20 min) - speaker
- 0:0 DAQ, on-line and off-line software, trigger, slow controls (25 min) - speaker
- 0:0 Experiment configuration layout, pre-installation, and installation schedule (20 min) speaker
- 0:0 Radiation dose on the calorimeter (15 min) speaker
- 0:0 Run documentation COO, ESAD, RSAD, etc.] (10 min) speaker
- 0:0 Staffing of the experiments (shifts, Run coordinators) (15 min) speaker
- 0:0 Path to first publications (10 min) speaker
- 0:0 Executive Session
- 0:0 Closeout
ERR Report
Materials for ERR
Presentations
Documentation
- X17 Proposal
- PRad II proposal
Run documentation
- Conduct of Operations (COO)
- Experiment Safety Assessment Document (ESAD)
- Radiation Safety Assessment Document (RSAD)
- Hall B Emergency Response Guidelines (ERG)
- Pre-run checkout
Operational procedures for non-standard equipment
PRad Target
- PRad Target ePAS
- PRad Target Operation procedures
HyCal
- HyCal ePAS
- HyCal Operation procedures
- HyCal Transporter ePAS
- HyCal Transporter Operation procedures
GEM
- GEM ePAS
- GEM Operation procedures
Vacuum Chamber
- Vacuum Chamber ePAS